With the requirements signed off by all discipline leads, David pushed the document into a lightweight change management system. Each week, a scheduled MicroStation Batch Process ran a validation script that checked every updated .DGN against the requirements.
David realized they needed a formal —not just a general BIM execution plan. He locked himself in a conference room with three senior CAD technicians and the IT infrastructure lead. Over two days, they reverse-engineered the project’s true needs. microstation software requirements
David didn’t need a meeting. He just sent the automated report: “Requirement violation: Section 2.4 (Levels) and 1.3 (Units). File blocked from federation until corrected.” With the requirements signed off by all discipline